PRODUCTION SCHEDULE

Below is a graph showing the progress of the Teal Camper and estimated production times

ASSEMBLY
CONCEPT
DESIGN
PROTOTYPE
TOOLING
PRE-SALES
BETA VERSION
PRODUCTION
Wall Panels      
in progress
July 2010
August 2010
September 2010
Door Assembly      
in progress
July 2010
August 2010
September 2010
Pop Up Top      

hard top/ soft sides

     
in progress
July 2010
August 2010
August 2010

hard top/ hard sides

   
concept
 
TBA
TBA
TBA
Dinette / Full size bed    
in progress
 
July 2010
August 2010
August 2010
Cabinets    
in progress
 
July 2010
August 2010
August 2010
Sink Module  
in progress
   
July 2010
August 2010
August 2010
Stove Module  
concept
   
July 2010
August 2010
September 2010
Refrigerator / Ice Box  
concept
   
July 2010
August 2010
September 2010
Toliet Module (Porta Potty is an option)
concept
     
TBA
TBA
TBA
Shower Module
concpet
     
TBA
TBA
TBA
Slip In Roller (for loading assembled camper)  
in progress
   
July 2010
August 2010
August 2010
Updated June 6, 2010

 